Case Study 4
Client: Mr & Mrs Mullen
Location: West Calder
Value: £9000
Completed: October 2013
The project commenced on September 2013 and was for the design and installation of a new driveway, walling, paving and steps.
KEY ISSUES
- With storm water running in towards the house it was essential to supply and fit drainage along the side and front of the house tied in to existing SW
- 2 individual lighting systems control by single remote control.
- Situated in a quite cul de sac, consideration had to be taken for times of cutting and use of vibrating plate and mixer
Principal Elements included:
60m2 of Marshalls scb paving
15m2 of Marshalls Indian sandstone
20m2 of walling
23 tons of type 1 sub-base