Case Study 8
Client: Mr & Mrs Robertson
Location: Wemyss Bay
Value: £7000
Completed: August 2014
The project commenced on July 2014 and was for the design and installation of a new driveway and steps.
KEY ISSUES
- Excavations and Fillings
- Situated in a quite cul de sac, consideration had to be taken for times of cutting and use of vibrating plate and mixer
- Continuous access for client
- With storm water running in towards the house it was essential to supply and fit new drainage tied in to existing SW
Principal Elements included:
60m2 of Marshalls Tegula block paving.
20 tons of type 1